06 March 2006

down to the studs

our bathroom has been a bugger. Paul has been working day and night remodeling our main bath. It will be so nice when it is done. Here it is in progress...



He now has the bath tub installed and plumbing rigged so we can bathe. How nice it was to take a bath after almost two days..ahh the little things in life we take for granted. Paul is doing a great job, I am thankful to have a husband willing and able to do this. This will make the house so much nicer. The shower/tub stall were original and strapped backwards to the studs. It was the biggest challenge for Paul to get it out. He cut the fiberglass enclosure into several pieces just to pry it out. Poor guy. Looks like the kitchen will be a lot easier, just because the cabinets will go downstairs and are attached normally. The floors are laminate and nearly new, they are floating floors, so hopefully we can use most of this downstairs as an added bonus. I am so excited with the IKEA design, we chose the more solid beech design with lots of horizontal cabinets. Really quite modern for our town, but we start a trend maybe ;).....The European design seems so much more smart...and economical. The cabinets we were going to order from a cabinet shop were at least double and really had less "bells and whistles" Ok well that is what we have been doing...thanks for listening to the dribble...

No comments: